2023 Operation
Re: 2023 Operation
The repairs went well, and the cooldown is in progress. We expect beams back on 11th September: a few days of machine checkout, followed by low-intensity protons — VdM, high-beta, pp reference fun at 2.68 TeV — then ion run.