Anyone notice the new SMP flags ?
- DCWhitworth
- LHCPortal Guru
- Posts: 603
- Joined: Mon Nov 30, 2009 8:13 am
- Location: Norwich, UK
Anyone notice the new SMP flags ?
There are now six, at the top 'Channel Link Status A-B B-A' has now appeared. Anyone know what it means ?
DC
The LHC - One ring to rule them all !
The LHC - One ring to rule them all !
- DCWhitworth
- LHCPortal Guru
- Posts: 603
- Joined: Mon Nov 30, 2009 8:13 am
- Location: Norwich, UK
Re: Anyone notice the new SMP flags ?
Explanation by pcatom given in chat -
It was always in the system ... just not displayed
It is the cross-linking of the 2 beam interlock systems for the 2 beams
each beam has an beam interlock system with many inputs. Some of these would just dump the individual beam - others would dump both beams
therefore the 'output' from the BIS beam1 should also be an input to the BIS beam2 and visa versa
quite a lot of logic behind it
It was always in the system ... just not displayed
It is the cross-linking of the 2 beam interlock systems for the 2 beams
each beam has an beam interlock system with many inputs. Some of these would just dump the individual beam - others would dump both beams
therefore the 'output' from the BIS beam1 should also be an input to the BIS beam2 and visa versa
quite a lot of logic behind it
DC
The LHC - One ring to rule them all !
The LHC - One ring to rule them all !